        Your present location:Home >> The engineering case >> CC case show >> calcium chloride plant with high tower

        Case presentation
        Company Profile
        Product Description

        KTT have rich experience & mature technology on calcium chloride engineering, including anhydrous CaCl2 and dihydrate CaCl2, both in granule and flakes. We possess a number of original techniques in the spray, fluidization, thermal energy utilization and system matching.

        The calcium chloride process mainly including three section:

        1. Reaction section

        2. Dry fluidized bed production section

        3. Calcium chloride finished product cooling section

        Technical advantage

        According to the special properties of calcium chloride solution, the specially designed atomizing system and special atomizer will ensure that the atomizer in the process of fluidized bed granulation is not blocked, and the material is not stained on the wall. Due to the special physical properties of calcium chloride, a special design of air distribution system and a distributor are the key components of the granulation equipment. The reasonable design determines the performance of the granulation equipment.

        Low investment, low consumption.

        Overall Operation advantage

        Professional logistic team, rich experience on container transportation and bulk transport.

        Powerful customs clearance ability. Our forwarders have good relationship with Inspection Bureau and customs. Complete database of cargoes, especially detailed information for set of CC .etc equipment suppliers and shipping.

        Strong ability to integrate the export and import documents. Such as customs clearance

        Case List
        No.
        Case
        Date
        1
        SOGP plant in Philippines for 10,000MTPA
        In 2016 Year
        2
        EPC projects of SOP in Egypt for 60,000MTPA&100,000MTPA
        In 2015 Year
        3
        Overhaul the furnace in Indonesia
        In 2011 Year
        4
        The project of SOP for 40,000MTPA
        In 2010 Year
        5
        Main equipment suppiler of SOP in India for 20,000MTPA
        In 2008 Year
        6
        Overhaul the furnace in Indonesia
        In 2007 Year
        7
        The contractor of SOP in Phlilippines for 10,000MTPA
        In 2006 Year
        8
        The EPC project of SOP in Indonesia for 10,000MTPA
        In 2004 Year
        9
        The equipment suppiler of FRP tank in Phlilippines 
        In 2004 Year
        10
        The contractor of SOP in Phlilippines for 10,000MTPA
        In 2004 Year